- Mon Apr 06, 2015 8:30 am
#193343
Hello All,
I was afraid when the first wipe was done. The second wipe I saw as opportunity (and perhaps you agree). Since the last wipe new blocks were introduced and we moved on, so I would like to suggest a new wipe end of this year (although I know that the tube is developing).
In addition I would like to suggest
- to add an option "level:xxx" for a plot where x is below 1 and 255 so that the ground can be wiped but the surface remains as it it.
- automatically keep the tube.
Pros: Intelli could use the coding of the last wipe (if the options are not implemented), so limited efforts; clean environment; new blocks
Cons: Paths/train lines will be removed (but that wasn't a big issue after the last wipe).
Best,
A.
I was afraid when the first wipe was done. The second wipe I saw as opportunity (and perhaps you agree). Since the last wipe new blocks were introduced and we moved on, so I would like to suggest a new wipe end of this year (although I know that the tube is developing).
In addition I would like to suggest
- to add an option "level:xxx" for a plot where x is below 1 and 255 so that the ground can be wiped but the surface remains as it it.
- automatically keep the tube.
Pros: Intelli could use the coding of the last wipe (if the options are not implemented), so limited efforts; clean environment; new blocks
Cons: Paths/train lines will be removed (but that wasn't a big issue after the last wipe).
Best,
A.